FusionModule5000 Smart Modular Data Center
Maintenance Guide (ECC800)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure 5-6 Removing the panel
Step 3 Remove cables connected to the left and right sides of the MCB, as shown in Figure 5-7.
When removing cables, label the cables with corresponding terminal ports for later connection.