EasyManua.ls Logo

Huawei LUNA2000 - Page 61

Huawei LUNA2000
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 5-6 Crimping an O
T terminal
(A) Core wire (B) Insulation layer (C) Heat shrink tubing
(D) Heat gun (E) Hydraulic pliers
Step 2 Connect the gr
ound point of the power control module to the external ground
point.
Figure 5-7 Grounding the PE cable
NO TE
It is recommended that silica gel or paint be used around the ground terminal after the
PE cable is connected.
----End
LUNA2000-(5-30)-S0
User Manual 5 Electrical Connection
Issue 01 (2020-10-20) Copyright © Huawei Technologies Co., Ltd. 55

Table of Contents

Other manuals for Huawei LUNA2000

Related product manuals