No. Parameter Description Remarks
25 Heartbeat
period at
application
layer (min)
Species the timeout period for the solar
inverter to connect to the management system.
-
7.1.5.4 Setting Power Adjustment Parameters
Procedure
Step 1 Choose Function Menu > Settings > Power Adjustment to go to the parameter
setting screen.
Figure 7-13 Power adjustment parameters (special user)
----End
Parameters
No.
Parameter Description Remarks
1 Remote power
schedule
If this parameter is set to Enable,
the inverter responds to the
scheduling instruction from the
remote port. If this parameter is
set to Disable, the inverter does
not respond to the scheduling
instruction from the remote port.
-
SUN2000-(175KTL-H0, 185KTL-INH0, 185KTL-H1)
User Manual 7 Man-Machine Interactions
Issue 19 (2023-12-20) Copyright © Huawei Technologies Co., Ltd. 86