Step 2 Install the L-shaped guide rails.
1. Position a guide rail horizontally in contact with the mounting bars in the
cabinet.
2. Tighten the screws to secure the guide rail. See Figure 5-6.
Figure 5-6 Installing an L-shaped guide rail
3. Install the other guide rail in the same way.
Step 3 Install the server.
1. Lift the server. This task requires at least two people.
2. Place the server on the guide rails and slide it into the cabinet. See (1) in
Figure 5-7.