EasyManua.ls Logo

Huawei UPS5000-E-300K-SMT - 3.3.3 Connecting Signal Cables

Huawei UPS5000-E-300K-SMT
300 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UPS5000-E-(50 kVA-300 kVA)
User Manual (50 kVA Power Modules)
3 Installation
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
110
Figure 3-74 Grounding
In the figure, the wiring terminal with a circle is the primary wiring terminal that connects to the ground
cable.
Step 4 Route power cables.
Dual mains
Remove the copper bar between mains and bypass input terminals, as shown in Figure
3-75.

Table of Contents

Other manuals for Huawei UPS5000-E-300K-SMT

Related product manuals