UPS5000-E-(50 kVA-300 kVA) 
User Manual (50 kVA Power Modules) 
 
Huawei Proprietary and Confidential                                 
Copyright © Huawei Technologies Co., Ltd. 
 
 
 
Only professional personnel are allowed to use this function. 
 
Clear faults before performing ECM active/standby switchover. For details about how to 
clear faults, see Clear Faults in section 4.1.3.3 Alarms Screen. 
 
After an ECM is inserted, active and standby switchover is supported only after the ECM 
is configured and starts working properly (about 30 seconds). 
When an ECM needs to be maintained, perform active/standby switchover on the ECM, as 
shown in Figure 4-68 (a dialog box will display asking for confirmation to prevent 
misoperations). After switchover, ensure that the ECM has stopped working (the yellow or red 
indicator is on, or the green indicator is blinking) before maintaining it. 
Figure 4-68 ECM switchover 
 
 
Screen Calib. Menu 
Calibrate the screen, as shown in Figure 4-69. 
Figure 4-69 Screen Calib. screen