EasyManua.ls Logo

Huawei UPSJZ-T Series - Page 35

Huawei UPSJZ-T Series
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No. Item Expected Result
4 Cable labels Both ends of each cable are labeled.
Labels are easy to understand.
5 Ground cable connection The UPS ground cable is securely
connected to the equipment room
ground bar. Use a multimeter to
measure the resistance between the
UPS ground cable and the equipment
room ground bar. The resistance is less
than 0.1 ohm.
6 Spacing between cable ties Distances between cable ties are the
same, and no burr exists.
7 Operating environment The inside and outside of the cabinet
are free from conductive dust or other
sundries.
UPSJZ-T-(1 kVA–3 kVA)
User Manual 3 Installation
2022-08-15 30

Related product manuals