2.2.2 Unit positioning
With IBC's air handling unit, you can install the unit so the air flows in a vertical up-flow or down-flow
direction, or in a horizontal left or right direction.
Figure 11 : Upflow installation Figure 12 : Downflow installation
Figure 13 : Left side installation Figure 14 : Right side installation
2.2.3 Adding air conditioning coils or heat pump coils
Cased evaporator coils used for providing cold air can be positioned above or below the air handling unit
as shown below.