EasyManua.ls Logo

Immergas Victrix Pro 80 2ErP - Installation of Vertical Terminals 80 Ø

Immergas Victrix Pro 80 2ErP
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
1-17
1-14
B23
B23
B23
B23
B23
1-15
1-18
1-16
1
2
1
INSTALLERUSER
MAINTENANCE TECHNICIAN
e kit includes:
1 - Steel 80 Ø exhaust terminal (1)
e kit includes:
1 - Ring (1)
1 - 80 Ø exhaust
terminal (2)
1.16 INSTALLATION OF VERTICAL
TERMINALS 80 Ø.
Configuration type B, open chamber and
forced draught.
80 Ø Vertical kit (plastic for indoor applica-
tions).
Kit assembly (Fig. 1-14): install the 80 Ø terminal
(2) on the central hole on the boiler up to stop,
making sure that the wall sealing plates (1) have
been tted. is will ensure the sealing eciency
of the kit components.
Maximum length (MAX L) (Fig. 1-15). e kit
with this conguration can be extended up to
a max. measurement of 28.0 m with Victrix Pro
80 2ErP, 14.0 m with Victrix Pro 100 2ErP and
8.5 m with Victrix Pro 120 2ErP, including the
terminal.
Using the 80 Ø vertical terminal for direct dis-
charge of the combustion products, the terminal
must be shortened (see quotas g. 1-16). e wall
sealing plate (1) must also be inserted in this case,
going up to stop on the boiler cover.
80 Ø Vertical kit (steel for outdoor applica-
tions).
Kit assembly (Fig. 1-17): install the 80 Ø terminal
(1) on the central hole on the boiler up to the
stop, ensuring the sealing eciency of the kit
components.
e 80 Ø steel terminal is used to install the boiler
outdoors with a direct exhaust. e terminal
cannot be shortened and once it is installed it
will extend out by 630 mm (Fig. 1-18).

Table of Contents

Other manuals for Immergas Victrix Pro 80 2ErP

Related product manuals