Connecting Power Cords
Use the included cables and connect them to the power sockets (in blue).
Power On Procedure
Before you power on the storage system, please power on the expansion enclosure
first if your network configuration has multiple arrays.
To power on the system please follow the procedures below.
1. Turn on the power switches to the “on” position for every PSUs power switches
(marked in green), from left to right.
NOTE
Please make sure all power supply modules switches are turned on.
2. Power on the networking devices, e.g. switches.
3. Power on the host computers. The host computers should be the last devices
that are turned on. Please refer to the documentation that came with your host
computers to see their power on procedures.