5
1. Preface
This installation manual is intended as a guide when planning and carrying out the installation of a EC-Track
TM
rail
system.
2. General
2.1 Installation
All installations must comply with the national rules and standards. Use only approved installation components
At every point of suspension, the roof/ceiling structure must be able to absorb a load of at least 300 kg.
Before mounting a rail system, the roof, walls, and floor must be examined carefully. In connection with the
examination, the exact materials involved in the roof and walls shall be determined. This examination must only be
carried out by a trained professional. The rail system must be mounted only by authorized personnel.
In accordance with the European standard EN 10535, the system shall be stress tested with 300 kg. This should
be done at each fixing point. This test is to be carried out as a testing of the substratum’s ability to keep the rail
system in place. This test shall be carried out by an authorised Invacare® service mechanic.
2.2 Warranty
There is a 3 year warranty on the EC-Track
TM
rail system and Robin
TM
.