EasyManua.ls Logo

Ivoclar digital PrograMill Dry - Machine Installation Procedures; Checking Scope of Delivery

Ivoclar digital PrograMill Dry
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Installing the machine
Checking the scope of delivery
Unpack the machine and ensure that you have
received the following items:
1 2
3 4 5 6
7 8 9 10
11 12 13 14
1. 1xPrograMill Dry machine
2. 1xSpindle service set
3. 1xPower cable
4. 1xUSB cable
5. 1xKey for the emergency release of the work-
ing chamber door
6. 1xPneumatic hose
7. 1xAdministrated tool board (ATB) in the
accessories container
8. 1x Cleaning brush for the material holder
9. 1 x Crevice nozzle (for cleaning the working
chamber)
10. 1xCompressed air regulator
11. 1 x Calibration set: 1 micrometer, 3 calibration
discs for manufacturing test and calibration
specimen, 1 radius cutter with 2 teeth (P200-
R2-40)
12. 1xMeasuring pin
13. 2xTool magazine inserts
14. 1xDrill bit(2.8mm) for tool positions
Not depicted:
n This document
n 1 x Carrying aid for transporting the machine
n 1 x Transport lock in the working chamber
n 1 x Supplement about removing the carrying aid
and transport lock
n 4 x Spare screw for the tool magazine cover
n Adapter connection to suction unit
n Zirconium oxide tools
Keep the packaging of the machine, the carrying
aid and the transport lock for future transports.
Operating Instructions:PrograMill Dry
Version: 11/19/2020
PrograMill Dry Installing the machine
EN 14

Table of Contents

Related product manuals