5 Installing the machine
Checking the scope of delivery
Unpack the machine and ensure that you have
received the following items:
1 2
3 4 5 6
7 8 9 10
11 12 13 14
1. 1xPrograMill Dry machine
2. 1xSpindle service set
3. 1xPower cable
4. 1xUSB cable
5. 1xKey for the emergency release of the work-
ing chamber door
6. 1xPneumatic hose
7. 1xAdministrated tool board (ATB) in the
accessories container
8. 1x Cleaning brush for the material holder
9. 1 x Crevice nozzle (for cleaning the working
chamber)
10. 1xCompressed air regulator
11. 1 x Calibration set: 1 micrometer, 3 calibration
discs for manufacturing test and calibration
specimen, 1 radius cutter with 2 teeth (P200-
R2-40)
12. 1xMeasuring pin
13. 2xTool magazine inserts
14. 1xDrill bit(2.8mm) for tool positions
Not depicted:
n This document
n 1 x Carrying aid for transporting the machine
n 1 x Transport lock in the working chamber
n 1 x Supplement about removing the carrying aid
and transport lock
n 4 x Spare screw for the tool magazine cover
n Adapter connection to suction unit
n Zirconium oxide tools
Keep the packaging of the machine, the carrying
aid and the transport lock for future transports.
Operating Instructions:PrograMill Dry
Version: 11/19/2020
PrograMill Dry – Installing the machine
EN 14