Ahe cable
-ning on the opng
caeo the boomhsng
exremty, as shown.
-sh
side of the boom.
THE BOOM
INSTALLING THE BOOM STEEL CABLE
-d the boom, as decribed in the section UNFOLDING AND FOLDING THE BO
framnhec
- Pul the boom endwth your hand
trying to raise it. This operaionwl release
the booocae
Aocothe 2nd boomo
- Lower the sliding frame all the way onto fixed frame. The boo
ph bo
- Tofastenthe2s
n theloc
dt correcty in the supp loosen
thess
coely.
- Rgthethesa
m