EasyManuals Logo

JCM DBV Series Manual

JCM DBV Series
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
Part No. 960-000187R_Rev. A © 2016 JCM American Corporation
11
DBV-500 Banknote Validator JCM® Training Overview November, 2016
Lecture Notes
5. Verify that the Host CRC and Device CRC values are identical (Figure 6 d).
6. Disconnect the USB Cable used for the Download, and remove power from the
DBV-500 Unit.
7. Set the DIP Switches on the DBV-500 Unit to the Operational position.
.
Figure 6 Downloader Suite Display
=d
c
a
b
NOTE: If the DBV-500 Software becomes corrupted or is not installed (e.g., when
changing the CPU Circuit Board), set Forced Download Mode by setting DIP Switch
Block #1 Switches #6, #7 and #8 ON. (The DIP Switches are located behind the Cash
Box; remove the Cash Box to gain access).

Other manuals for JCM DBV Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the JCM DBV Series and is the answer not in the manual?

JCM DBV Series Specifications

General IconGeneral
BrandJCM
ModelDBV Series
CategoryBank Note Validator
LanguageEnglish

Related product manuals