EasyManua.ls Logo

JRC JLN-900 - Positioning of Labels

JRC JLN-900
308 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7-22
9.4 Positioning of labels
In every shipment of a JLN-900 Speed Log a set of two labels is included inside the
JLN-900 Speed Log main unit electrical cabinet, Sig.Processor. The installation
company shall place those labels on or by the Speed Log Master Display.
One label, with the text “Master”, is intended for placing on the front foil surface of
the Speed Log Master Display below the model name. The other label, with the text
Speed Log Master Display”, shall be placed on the console surface adjacent to the
Display frame or directly on the upper frame surface.
Esc Menu Enter
SAL
SD4-2
Test
Press
2 sec
DIM
STW
SOG
U/N 704042
Mode
Longitudinal kn
Transverse kn
Mode
STW
Trip /
DIST
Reset
Trip
-+
é Consilium
NWW-82

Table of Contents

Related product manuals