EasyManua.ls Logo

JRC JLN-900 - Page 80

JRC JLN-900
308 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-42
11. Pre-mounting of the Tube Bracket. See picture below!
x Ensure that the Connecting tube and contact surface of the Tube brakets are clean.
x Use MoS2 grease on the Tube brackets M12 Screw threads.
x Mount the two clamping parts close up against the Cable Gland and slightly
tighten the two M6S M12x55 Screws with Spring Washers in order to allow lifting
the complete assembly by the Tube Bracket.
Transducer fully retracted into Valve Cover Tube Bracket pre-mounted
12. Before raising and lifting the assembly vertically, arrange assisting personnel or a
support rope or sling around the Tube Bracket to securely hold the Transducer in fully
retracted position inside the Valve Cover during the mounting procedure on the Sea
Valve and also to avoid accidently hitting any hard surfaces
13. Place a gasket, Seal 2, centred with the screw holes on the clean Sea Valve top flange.

Table of Contents

Related product manuals