EasyManua.ls Logo

JRC JUE-95SA - Procedure of Security Alert Test Transmission

JRC JUE-95SA
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-18
3.4.2 Procedure of Security Alert test transmission
Step1 Push the Test Button of IME, then the button lights.
Step 2 Push down Security button.
Light of the button changes from lighting to blinking after 30 seconds passed, and then starts
Test transmission.
Step 3 Blinking of Test button stops and lights with normal status, when the test transmission is
completed.
Press Security button again.
Step 4 Push Test button.
Light of button disappears.
Light of Test button is not disappear, and buzzer begins to sound even Test button is pushed,
when the Security button is not turned off correctly, on the status of Step 3.
Push Test button after turned off Security button, certainly.
Security Alert transmission is not canceled as long as one button is remained turned on.
NOTE
Time required until completing Test transmission
Transmission setting number
15 minutes217 minutes329 minutes441minutes553 minutes
The time required is done back and forth according to the state of the line and the message
length, etc.
NOTE
Confirm all of security buttons are turned off before you start the test transmission.
Test transmission is impossible as long as one button is remained turned on.
NOTE
Below mentioned message is sent to destination, when Security Alert is transmitted.
This is a SECURITY MESSAGE
Ship Name :ABCD
Call Sign :DFGZ
MMSI :123456789
TEST TEST
MES NO, 987654321
LAT,N12 34.56LON,E123 45.56,UTC,07.01.2004 12:34,SOG,
10.0KT,COG,20DEG
Automatic
insertion
message
(Example)
Users edit
message
(Example)
NOTE

Table of Contents

Other manuals for JRC JUE-95SA

Related product manuals