Table 25: Site Preparaon Checklist
(Connued)
Item or Task For More Informaon Performed By Date
Verify that your rack or cabinet meets the
minimum requirements for the installaon
of the switch.
"QFX5200 Rack Requirements"
on page 72
"QFX5200 Cabinet
Requirements" on page
74"Determining QFX5200
Opcal Interface Support" on
page 76
Plan rack or cabinet locaon, including
required space clearances.
"QFX5200 Clearance
Requirements for Airow and
Hardware Maintenance" on
page 69
Secure the rack or cabinet to the oor
and building structure.
Cables
Acquire cables and connectors:
Determine the number of cables
needed based on your planned
conguraon.
Review the maximum distance
allowed for each cable. Choose the
length of cable based on the distance
between the hardware components
being connected.
"Determining QFX5200 Opcal
Interface Support" on page 76
Plan the cable roung and management.
RELATED DOCUMENTATION
General Safety Guidelines and Warnings | 169
QFX5200 Installaon Overview | 95