JUNTTAN Operator’s manual
5
6. DAILY OPERATION SECTION .............................................. 57
6.1 GENERAL ....................................................................................... 57
6.2 COMMISSIONING, STARTING AND STOPPING ........................... 58
6.2.1 STARTING ENGINE ........................................................... 58
6.2.2 STOPPING ENGINE........................................................... 59
6.3 STABILITY ...................................................................................... 59
6.4 MOVING THE MACHINE BETWEEN WORK SITES ...................... 60
6.4.1 LIFTING OF THE LEADER ................................................. 60
6.4.1.1 PREPARATION FOR LEADER LIFTING ............. 60
6.4.1.2 TESTING RELEASING VALVES OF FORWARD
INCLINATION CYLINDER ................................... 61
6.4.1.3 LIFTING WITH THE LEADER LIFT DEVICE ....... 62
6.4.1.4 FINAL LIFTING..................................................... 63
6.4.1.5 LOWERING THE LEADER LIFT DEVICE ............ 63
6.4.2 LOWERING THE LEADER ................................................. 64
6.4.2.1 PREPARATION FOR LOWERING THE LEADER 64
6.4.2.2 LOWERING THE LEADER TO THE LEADER
LIFT DEVICE ........................................................ 65
6.4.2.3 LOWERING THE LEADER LIFT DEVICE WITH
THE LEADER ....................................................... 66
6.5 DAILY OPERATION ........................................................................ 67
6.5.1 LIFTING OF THE PILE ....................................................... 67
6.5.2 HAULING OF THE PILE ..................................................... 68
6.5.3 LIFTING PILE TO THE LEADER ........................................ 69
6.5.4 POSITIONING OF THE PILE ............................................. 69
6.5.5 MOVING MACHINE ON THE WORKING SITE .................. 71
6.5.6 WORKING ON THE SLOPING GROUND .......................... 73
6.5.7 INCLINING (RAKING) A PILE ............................................ 74
6.5.8 PILE EXTENSION .............................................................. 74
6.5.9 OPERATING THE HAMMER .............................................. 75
6.5.9.1 MANUAL HAMMER OPERATION ........................ 77
6.5.9.2 CONTINUOUS HAMMER OPERATION .............. 78
6.6 MOUNTING AND DISMOUNTING OF EQUIPMENT ...................... 80
6.6.1 MOUNTING OF THE HAMMER ......................................... 80
6.6.2 LIFTING OF THE HAMMER ............................................... 81
6.6.3 MOUNTING OF THE CATHEAD ........................................ 82
6.6.4 LEADER SHORTENING ..................................................... 82
6.6.5 LEADER EXTENSION ........................................................ 84
6.6.6 USE OF STABILIZERS ....................................................... 85
6.7 TRACK WIDTH ADJUSTMENT....................................................... 85
6.8 TRANSPORTING AND STORING THE MACHINE ......................... 86
6.8.1 DRIVING ONTO A TRAILER .............................................. 86
6.8.2 DRIVING OFF A TRAILER ................................................. 86
6.8.3 TRANSPORTING THE MACHINE ...................................... 87
6.8.4 STORING THE MACHINE .................................................. 88
6.8.5 LIFTING THE MACHINE .................................................... 89
6.8.6 CENTER OF GRAVITY OF THE MACHINE ....................... 90
7. ROUTINE SERVICE SECTION ............................................... 91
7.1 SAFETY REGARDING LUBRICATION AND SERVICE ................. 91