EasyManua.ls Logo

JUNTTAN PM 20L - Page 79

JUNTTAN PM 20L
141 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JUNTTAN Daily operation section
79
Pile fast sinking in the soft soil:
Sometimes the pile may sink faster if the soil is soft below the pile.
In this case the hammer stroke must be stop with piling interruption switch on the
left console.
The hammer and pile winch brakes are open during interruption.
When sinking is finished start continuous hammer operation again, switch OFF
piling interruption switch.

Table of Contents