Installation KeContact P20
34 Installation manual, Version: 1.41 / Article no.: 90064
© KEBA 2012-2013
PHASES / ONLY FOR LOAD MANAGEMENT MODE
DSW1.3 to DSW1.5
Function DIP-switch Figure
Supply (phases)
D1.3
ON=
only 1
phase
OFF= all
3
Phases
Phase assignment (*) D1.4 D1.5 Figure
OFF OFF
Phase L1 at terminal 1
connected
ON OFF
Phase L2 at terminal 1
connected
OFF ON
Phase L3 at terminal 1
connected
ON ON
(*) Comments:
For load distribution, with 1-phase operating mode, any phase (L1, L2 or L3) of the mains supply line
can be connected to the connection terminal 1.
The determination of which phase of the mains supply line was connected serves for informing the
(optional) load management software in order to facilitate an efficient and proper load distribution.