24. Commissioning instructions
24.1
Before applying power to the panel, the extinguishant device (solenoid or igniting actuator) must
be physically isolated from the system by disconnecting both wires to it. This will prevent any
accidental release of extinguishant
.
24.2
When power is applied, if all connections are correct, only the green Power On and either the
Automatic and Manual or Manual Only indicators should be lit.
If any fault indicators are lit the wiring to the appropriate input or output should be checked an all
faults cleared before proceeding.
24.3
Once the panel is fault free, it can be configured with the desired options as described in section 17.
24.4
Once the panel has been configured the system should be thoroughly tested to ensure that the
control panel responds as expected and required.
24.5
After satisfactory testing, any final connections should be made (such as to the extinguishant
release actuator).
24.6
A record of the configuration options that have been set should be recorded in the table on section
22 and this manual provided as part of the documentation recommended by BS5839:Part 1:2002
section 40.2 b).