EasyManua.ls Logo

Keysight Technologies 16452A - 2 Initial Inspection; Introduction

Keysight Technologies 16452A
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
Keysight 16452A Liquid Test Fixture
Operation and Service Manual
2 Initial Inspection
Introduction
The liquid test fixture has been carefully inspected before being shipped from
the factory. It should be in perfect physical condition, no scratches, dents or
the like. It should also be in perfect electrical condition. Verify this by carefully
performing an initial inspection to check the liquid test fixture set for signs of
physical damage and missing contents. If any discrepancy is found, notify the
carrier and Keysight Technologies. Your Keysight Technologies sales office will
arrange for repair or replacement without waiting for the claim to be settled.
Inspect the shipping container for damage. Keep the shipping materials
until the inspection is completed.
Verify that the shipping container contains everything shown in Figure 2-1
and listed in Table 2-1.
Inspect the exterior of the 16452A for any signs of damage.

Table of Contents