Network Analyzer 15
Contents
Regulatory Compliance Information 6
Safety Notice Supplement 7
Checking the Shipment 18
Environmental Requirements 20
Operating Environments 20
Ventilation Requirement 20
Protection Against Electrostatic Discharge (ESD) 21
Ensuring Adequate Free Space around Meter for Immediate
Disconnection of Power Cable in Case of Emergency 22
Installing Front Handles/Rack Mounting Flanges 23
How to Install the Handle Kit (Option 1CN) 24
How to Install the Rack-mount Kit (Option 1CM) 25
How to Install the Rack-mount and Handle Kit (Option 1CP) 25
Connecting Test Head 27
Connecting the DUT when using a special test fixture 27
When using the test head fixed on a handler, etc. 29
Caution for connecting the SMA connector to the test head
connector 30
Connecting Mouse and Keyboard 32
Power Supply 33
Verification of the Power Supply 33
Verification and Connection of Power Cable 33
Blown Fuses 34
Starting the E4982A 35
Turning the Power ON and OFF 35
Disconnection from Supply Source 36
Initial Registration of E4982A 38
Calibration of the Touch Screen 44
Troubleshooting during Startup 48
System Recovery 49