24 LCR Meter
1 Installation
How to Install the Handle Kit (Option 1CN)
The handle kit is used for transport and relocation of the
E4982A. While referring to Figure 3 install the handle kit by
following these steps.
Step 1. Remove the adhesive- backed trim strip (1) from
each side of the outer frame of the E4982A front panel.
Step 2. Use the screws provided screws to mount the front
handles (2) on each side of the E4982A front panel frame.
Step 3. Attach the modified trim strip (3) provided to each
front handle in order to cover the front panel locking
screws.
Figure 3 Installing front handle/rack-mount kits