5.Setting of the wire
①:Keep the right side roller UP/DOWN knob
U
(UP) position (roller is up).
②:With your hand, insert the wire from the right side wire guide, the right side roller, the
guide pipe to a little bit left from the blade. But if it’s too longer, it causes errors. Then
down the right side roller UP/DOWN knob to
D
(DOWN) position.
Caution:Check if the left side roller is closed. If not, the wire can’t be discharged and it
causes troubles.
6. The preparation has been completed now.
The wire will be processed when the [START] button is pressed.
Check the processed wires condition such as the length of the wire or scratch of the core
wire and if these are acceptable, set the setting pieces again to start a regular processing.
Method of processing by using automatic wire feeding function
①:《Wire Sensor 》 should be ON on the 《Motion》 screen.
②:After adjusting the left side roller gap properly, keep both right and left rollers down (
D
)
condition.
And holding the wire to be processed with your hand, press [START].
③:As soon as the roller begins to rotate, feed the wire from the right side wire guide to the
roller.
④:When the left side roller detects the wire, the wire will be fed automatically to start
processing.
※However, if 《Wire Sensor》 is OFF or 《Short Mode》 is selected on the 《Motion》 screen,
it is not performed.