5
.
In case of tube or cutting only
Input 《Total Length》 only. 《Front Strip Length》, 《Front Half Strip Length》, 《Rear Strip
Length》 and 《Rear Half Strip Length》 should be “0”.
Any numerical value is acceptable for 《Core Diameter》 and 《Blade Move Back》. Setting Pieces
and Gap Adjustment are required.
6.
Pressure Adjustment
Increase the pressure of roller when wire is too hard or when it is difficult to strip the insulation.
Loosen the pressure adjustment screws which are at both side on the front panel and tighten
them to fix at arbitrary position. The larger value is the stronger pressure.
Caution:If pressure adjustment screws are loosen too much, they will drop off. Be careful
to tighten the screws too much as well.
7.
When taking out the wire after finishing the processing
Up the roller by turning the right side roller UP/DOWN knob to take out the wire.
Caution:If the wire is left being held at feeding roller part, the wire might be likely to
be transformed.
When not being processed, take out the wire.
8.Replacement of Guide Pipe
・If the guide pipe is damaged or worn out, the processing
might not performed normally. Check it regularly, and if
abnormality is detected, replace it with a good one.
・Demount
Loosen the arrowed plastic screw to take out
the guide pipe.
・Mount
Mount it properly so that the knock pin can
insert the knock hole of the pipe block, and
fasten the screw.
9.Replacement of wire guide
・Demount Loosen the arrowed 2 screws to take it out.
・You can adjust up and down according to the wire.