EasyManuals Logo
Home>Kohler>Engine>KD62V12

Kohler KD62V12 Operation And Maintenance Manual

Kohler KD62V12
210 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #100 background imageLoading...
Page #100 background image
Maintenance
Post maintenance activities
Painting
u Shake the spray paint can for 3 minutes.
u Spray the paint at a distance of 25 cm (9.84 in) to 30 cm (11.81 in), making a criss-cross
pattern.
u Spray enough layers to cover the whole unpainted area.
u Turn the spray can upside down and bleed the valve after finishing the paint work.
Information
In optimal conditions (20 °C (68 °F), 65% of humidity), the paint is completely dry after 24 hours.
100
© 2022 by Kohler Co. All rights reserved.
KD62V12 33521030301_8_1 EN_US 2022-09

Table of Contents

Other manuals for Kohler KD62V12

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kohler KD62V12 and is the answer not in the manual?

Kohler KD62V12 Specifications

General IconGeneral
BrandKohler
ModelKD62V12
CategoryEngine
LanguageEnglish

Related product manuals