EasyManua.ls Logo

Kohler KD62V12

Kohler KD62V12
210 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Control and operation
Initial starting after out of service period
4.5 Initial starting after out of service period
4.5.1 Preparation of initial starting
For initial starting or after a suspension of activity, perform the following tasks:
u Replace engine oil. Refer to chapter Maintenance.
u Replace oil filters. Refer to chapter Maintenance.
u Perform a general visual inspection. Refer to chapter Maintenance.
u Check coolant level. Refer to chapter Maintenance.
u Drain off water and sediment of fuel tank. Refer to Operation and Maintenance Manual.
u Check water separator of fuel pre-filter and bleed water if necessary. Refer to Operation and
Maintenance Manual.
u Check visually the starter, battery charging alternator.
u Check belt, and replace if necessary. Refer to chapter Maintenance.
u Vent the fuel system. Refer to Operation and Maintenance Manual of generator set.
KD62V12 33521030301_8_1 EN_US 2022-09
© 2022 by Kohler Co. All rights reserved.
75

Table of Contents

Other manuals for Kohler KD62V12

Related product manuals