EasyManua.ls Logo

Kongsberg Simrad AP20 - Page 59

Kongsberg Simrad AP20
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
20220505H 57
Pull out each terminal before connecting the wires. Remove all
strands before putting on the terminal cover.
Power Board terminals
Main Board terminals
Note!
The Mains input
is not polarity
protected on
J300X-40.
Ground terminal
TB9 and TB10 are not on the
J3000X Power Board

Table of Contents

Related product manuals