9 Related Documents
53 of 60
Multi Eco
9.2.2 Multi Eco Top
Fig.9: Installation drawing of Multi Eco-Top
A Suction head operation B Suction lift operation
H
1
Minimum 0.3 m H
2
Minimum 0.1 m
H
3
Maximum 8 m
1 Suction strainer with foot valve 2 Suction strainer
3 Gate valve 4 Pipe clamp
5 Pressure switch 6 Accumulator
7 Pump set
9.3 Dimensions
Multi Eco
Multi Eco P Multi Eco E and D
A Suction nozzle B Discharge nozzle
(1) Two holes Ø 8 (2) Length 1.5 m
Table15: Dimensions in mm
Multi Eco Ø A
Suction nozzle
Ø B
Discharge nozzle
l
1
l
2
H ØM
33 G 1 G 1 151.5 387 215 118
34 G 1 G 1 151.5 387 215 118
35 G 1 G 1 180 415 215 118
36 G 1 G 1 208.5 467 230 140
65 G 1
1
/
4
G 1 208.5 467 230 140