31
Fu
sion
T8
b1
esaw
Wiring Diagram: Fusion F2 230V
1. Wiring should only be done by professional
electricians. Always make sure the machine is
properly earthed.
2. All wirings in the cabinets should be protected
against direct contact to at least IP2X when finishing
electrical installation.
3. All exposed conductive parts should be connected
to the protective bonding circuit.
4. Close and lock the door of cabinets。
1. Enough space around the machine and the
cabinets should be kept in order to maintain
conveniently.
2. The machine should be installed in a workshop
with good illumination and ventilation.
3. Over-voltage protection device should be
provided by end user on spot.