LAUNCH                                                                                                                    Electronic Two-post User’
20 
1# 2#
A
B
C E
D
3563mm(140.28in)
1
3
1
m
m
(
5
.
1
6
i
n
)
3107mm(122.32in)
228mm
(8.98in)
228mm
(8.98in)
Fig. 7c
2
 
TLT235SCA
(
((
(
U
)
))
)
Model
:
   
  Base plate symmetric installation is as shown in 7d
1
:
With  total  width  (A)  as  the  basis,  draw  two  parallel 
lines (#1 and #2) on the concrete slab, with the error 
within  3mm.Determine  the  power  side  column 
location on any chalk line, and mark the total width (B) 
of  the  base  plate.  Mark  the  points  3  and  4.Starting 
from  point  3,  draw  one  diagonal  line  (C),  forming  a 
triangle. In this way, the vertical lines can determine 
the location of the two columns. 
B
C
A
2#1#
70mm
(2.76in)
3392mm(133.54in)
2582mm(101.65in)
3
4
1
5
.
5
m
m
(
1
3
4
.
4
7
i
n
)
2792mm(109.92in)
4
0
0
m
m
(
1
5
.
7
5
i
n
)
4
3
 
Fig.7d
1
 
Base plate asymmetric installation is based on a total width 
(A) shown in
 7d
2
,
draw two parallel lines (#1 and #2) on 
the concrete slab, with the error within 3mm.Determine a 
point B at any point on chalk line #1, based on point B, 
move down 131mm, then move right 228mm to get point C. 
Based on point B, draw #1’s vertical line M with a length of 
A to get point D .Based on point C, draw line M’s parallel 
line N with a length of L to get point E. With four points 
B,C,D,E, each post’s position can be decided.   
E
D
C
B
2#
1#
1
3
1
m
m
(
5
.
1
6
i
n
)
228mm
(8.98in)
228mm
(8.98in)
3544mm(139.53in)
3088mm(121.57in)
Fig 7d
2
 
 
(C) Diagtools; www.diagtools.eu; diagtools@diagtools.lv; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069