EasyManua.ls Logo

LEGRAND DMX3 1600

LEGRAND DMX3 1600
104 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
81
DMX
3
16. Loading in panel
Pull-out the base Rail and ensure that the breaker is in insulated position (see position indicator).
Breaker can also be moved by 2 people. Ensure that Breaker rests correctly on the 2 slots of both base rail sides.
Improper
loading
of breaker
may lead
to personal
injury and
damage to
product.

Related product manuals