EasyManua.ls Logo

Leisure Unity - Solar Power & Lighting Maintenance

Leisure Unity
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Unity Motorhome
85
Electrical System Operation
2
3
4
5
Solar ower nit
Your motorhome may be equipped with a solar
power kit. The solar power unit continuously
charges the coach batteries to help keep
them topped up. The solar controller (1) is
located in the cabinet above the passenger
seat. Refer to the solar controller manual in
the Motorhome Information Kit for detailed
operating instructions.
NOTICE
The solar power unit is intended to top-up
the coach batteries onl. t does not generate
enough power to run the motorhome’s
electrical system.
Lighting aintenance
The following procedures detail replacement of
the coach interior and exterior lights.
isconnect the chassis and coach batteries
before carring out maintenance on the
lighting system.
terior Lighting
pper Clearance Lights 2
O his is a sealed Lunit and must
be replaced as complete unit.
1. Reove the two screws 3and pull the light
out of the bodywork to gain access to the
connections.
2 Disconnect the old and reconnect the new
light.
3 Insert the new light into the bodywork and
secure with the two screws 3
Side arer Lights 
O his is a sealed Lunit and must
be replaced as complete unit.
1. Unclip the lens cover (not shown).
2 Reove the two screws 5, and pull the
light out of the bodywork to gain access to
the connections.
1
Caution
3 Disconnect the old and reconnect the new
light.
 Insert the new light into the bodywork, and
secure with the two screws 5 and reinstall
the lens cover.

Table of Contents

Related product manuals