EasyManua.ls Logo

LEM DCBM 400 Series - 6.1.3. STEP 3 - Achieve Further Validation

LEM DCBM 400 Series
95 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 52/95
21January2021/Version 0
LEM International SA
Chemin des Aulx 8
1228 PLAN-LES-OUATES Switzerland
www.lem.com
In particular, the following data are of specic interest:
• The di󰀨erence register for the current transaction, displayed at the bottom of every screen
• Total energy registers (import and export) at the beginning and end of the transaction
• Duration of the transaction, at the end of the transaction
• Public key for LEM format authenticity check (i.e. without OCMF RFC5480 header)

Outside transactions, buttons give free access to data, which can help checking metrological
status and registers. For instance, the following data can be of interest.
• Transaction prerequisites: Status of Sensor Unit link and of time synchronization
• Metrological follow-up: Total energy registers
• Data authenticity: Public key (without OCMF RFC5480 header)
Figure 32: Maintenance screens which can help metrological validation
The full list of data is available in section "6.6. Maintenance state".
A
B
1/5
2/5
3/5
4/5
5/5

Table of Contents