Figure 3. Removal of the shipping bracket
(Optional) Remove the enclosure from the rack
Notes:
• Depending on the specific configuration, the node, enclosure, or rails might look different from the
illustrations in this section.
• For details of the rail options for the rack installation, see
“ Rail Installation Guides” on page 179.
Attention:
• Make sure to have enough help and use safe practices when lifting the enclosure.
Procedure
Step 1. Make preparations for this task.
a. Power off the node and disconnect all power cords from the node (see
“Power off the server”
on page 8
).
Step 2. If applicable, open the rack release latches and remove the screws that secure the enclosure to the
rails.
Figure 4. Removal of screws from rack release latches
1 Rack release latches 2 Front screw
Chapter 1. Hardware replacement procedures 11