Commissioning
Commissioning steps
6
l
28
EDS82ZAFIC EN 2.0
Detailed
information
ProcedureStep
11. Enable process output data with C1512 = 255.
Only required when C1511 has been changed.
12. Enable the standard device via terminal 28 (CINH).
l Set terminal 28 to HIGH level.
13. Select setpoint.
l The master transmits the setpoint via the selected process output data
word.
14. Change to the READY TO START state:
l The master transmits the DRIVECOM control word:
0000 0000 0111 1110
bin
(007E
hex
).
INTERBUS
communication
manual
^ 42
15. The standard device is in the READY TO START state.
l The master receives the DRIVECOM status word:
xxxx xxxx x01x 0001
bin.
16. Change to the OPERATION ENABLED state.
l The master transmits the DRIVECOM control word:
0000 0000 0111 1111
bin
(007F
hex
).
17. The drive starts up.