Installation instructions:
1. Remove the four marked screws at the side of the pump in the pump
enclosure. Store these screws in a safe position.
2. Use suitable M8 screws to mount mounting frame at the target
location.
3. Lift or roll pump on the mounting frame with the pump centered on the
mounting frame.
45
300902516_002 - 10/2020 - © Leybold
Operation