ENGLISH
53
The fault state will be cleared when the battery pack resumes into normal
operation. If battery pack is not working properly and the issue persists,
contact a qualied staff, Installer or LG Energy Solution regional contact
service point.
NOTE
For serious warnings, if no proper corrective action is taken by the inverter,
the battery pack’s circuit breaker will automatically trip to protect itself.
CAUTION
If the battery pack or the inverter indicates FAULT or fails to operate, contact
LG Energy Solution regional contact point or your distributor immediately.
6.1.1 Post-Installation Checklist
Yes No
1. Visually check if the wiring matches the installation
manual. (Refer to the chapter.4)
2.
The circuit breaker is ON.
3.
The battery LED power indicator is ON.
4.
The inverter power is ON.
5.
The inverter has the latest rmware installed.
6.
The inverter recognizes the battery.
7. The battery is operational after installation.
7-1. The AC grid is connected.
7-2. The meter is installed.
7-3. Government approval is complete.
8. IF ANY ITEM IN #7 IS CHECKED AS “NO” OR IF THE
INVERTER NEEDS TO BE TURNED OFF, TURN OFF
THE CIRCUIT BREAKER. 3)