EasyManua.ls Logo

LGL Electronics EcoPower - Replacing the Main Electronic Control Board

LGL Electronics EcoPower
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
5 - MAINTENANCE OPERATIONS
5.2 REPLACEMENT OF THE MAIN ELECTRONIC CONTROL BOARD
The main electronic control board can only be replaced by a regularly
authorised L.G.L. service and repair centre.
10) At this point the flywheel (30) can be removed. It is now also easy to
replace the ceramic bushing (31) located in the yarn feeder shaft.
30
31
02_ECOpower_Rv0_ENG@01# 28/08/14 18.26 Pagina 31