EasyManua.ls Logo

LGMG MT86 - Page 106

Default Icon
165 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MT86 Operation and Maintenance Manual
100
burr, oil dirt, etc.
● After applying accelerant, do
assembly and arrangement quickly;
otherwise the retaining compound will
cure soon and it will bring difficulty
to assembly work. If only retaining
compound is applies and accelerant is
not sprayed, the assembly should be
placed on platform for 24 h till the
retaining compound become dry, and then
perform the next step of drilling.
● The bottoms of the two brackets must
be on the same plane; otherwise it is
adverse to the installation of assembly
and frame.
● After drilling, immediately check

Related product manuals