EasyManua.ls Logo

Linde E12 - Check secure fastening, condition and function of lift mast, lift mast chains, lift cylinders and end stops; Check the tilt cylinder bearings for wear

Linde E12
222 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Servicing 5
Inspection and maintenance every 500 to 1000 operating hours or once a year
CAUTION
Overheating of power sections possible.
All fans must be inspected and cleaned under the
inspection and maintenance overview programme.
e3861303
1
2
3
¾ All four fans including the cross fan (1) for
the motor compartment must be checked
for proper functioning.
Wheel gear oil change
ENVIRONMENT NOTE
Take note of information about working ma-
terials. See Recommendations for working
materials
NOTE
The wheel gear oil change should be carried
out after the first 50 operating hours and after
1000 hours, with further oil changes taking
place every 3000 hours.
Operating Instructions 386 807 1001 EN 03/2006 117

Table of Contents

Related product manuals