EasyManuals Logo

Lippert Components PSX1 User Manual

Lippert Components PSX1
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #24 background imageLoading...
Page #24 background image
Rev:11.08.19 Page 24 CCD-0001573-08
Preventive Maintenance
1. For optimum performance, the system requires full battery current and voltage. The battery must be
maintained at full capacity.
2. Check the terminals and other connections at the battery, the controller, and the jacks for corrosion, and
loose or damaged connections.
3. Remove dirt and road debris from jacks as needed.
4. If jacks are down for extended periods, it is recommended to spray exposed leveling jack rods with
a silicone lubricant every three months for protection. If the trailer is located in a salty environment, it is
recommended to spray the rods every 4-6 weeks.

Table of Contents

Other manuals for Lippert Components PSX1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lippert Components PSX1 and is the answer not in the manual?

Lippert Components PSX1 Specifications

General IconGeneral
BrandLippert Components
ModelPSX1
CategoryLifting Systems
LanguageEnglish

Related product manuals