Prior to Installation
All screws/rivets supporting the awning assembly must have a backer within the structure of the wall of the
coach.
Resources Required
• Three people
• Drill or cordless screw gun
• #2 square screwdriver bit
•
⁄
” nut driver bit and/or rivet gun
Installation
Insert drive head pin (Fig. 1A) into cap (Fig. 1B). Align holes and secure with wax screw (Fig. 2A). Insert screw
fully, but do not over-tighten. Repeat process for idler head at other end.
Station a person at each end of the awning assembly to hold the support arms. A third person will line up
the fabric cord with the previously-installed awning rail. Slide the fabric cord to desired position.
Set the awning assembly to the desired height and attach it to the side of the coach with two #14 x 1
½
”
screws (286576) at the top (Fig. 3) and two #14 x 1
½
” (286576) screws at the bottom (Fig. 4).
A
B
A
Fig. 1 Fig. 2
Fig. 3 Fig. 4
286576
286576