EasyManua.ls Logo

Lippert Components Solera Power Awning - Securing the Fabric

Lippert Components Solera Power Awning
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Solera
®
Power Awning
lippertcomponents.com 574-537-8900 Rev: 02.17 Solera
®
Power Awning
10. Cut the zip ties and connect the wires from the drive
head assembly to a power source and run the awning
half way out. Remove the wire cover to expose the
fastening points. Install the remaining two (2)
#14 x 1 1/4" screws at any of the three locations shown
(Fig.7) in the center of the support arm. Repeat this
process for the other side of the awning assembly.
Securing the Fabric
1. Extend and retract the awning several times to ensure
that the fabric is square on the roll tube.
2. Secure the fabric in the awning rail no more than
1" inside the edge of the fabric on both ends using a
#6 x 1/2" hex head screw. Install the screw down
through the awning rail into the fabric and the
polycord (Fig.8).
Fig.8
awning rail
1"
fabric stitching
Fig.7
possible
fastener
locations

Other manuals for Lippert Components Solera Power Awning

Related product manuals