EasyManua.ls Logo

Lockformer Vulcan 1000B - Torch Head Assembly Maintenance

Lockformer Vulcan 1000B
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. REINSTALLATION AND ASSEMBLY OF THE VULCAN TORCH HEAD
Regular maintenance of the torch head includes resetting the torch height for the stock being cut,
and cleaning; as described at the end of this section.
If a torch head is ever to be removed and a new one installed, or if a torch head has to be reset, use
the following procedure:
1. Disconnect primary power leads and gas tanks before beginning actual removal of torch head
from main machine.
Complete head assembly in place on bracket.
PHOTO 1
Maintenance... Page 2
H. WEISS MACHINERY & SUPPLY
H. WEISS MACHINERY & SUPPLY
PHONE: (718) 605-0395 - www.hweiss.com

Table of Contents

Related product manuals