EasyManua.ls Logo

Logic Instrument Fieldbook E1 - Preparing for Installation; Switch on the Main Battery

Logic Instrument Fieldbook E1
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fieldbook) E1) User’s) Guide)
30
2.2. Preparing for Installation
The Fieldbook E1 is designed and pre-configured for easy setup and use.
This section describes the installation steps you should follow to get the
system running as quickly as possible.
2.2.1. Switch ON the Main Battery
The internal battery is switched off during transit in order to completely cut
off power to the device.
To switch on the main battery:
1. Open the I/O ports door.
2. Slide the battery switch to ON using a thin object like a small screw
driver
Turning ON the battery

Table of Contents

Related product manuals