Lucent Technologies Lineage
®
2000 ECS Battery Plant J85500D-3
2 - Table of Contents Issue 5 January 1999
Reserve capacity 3 - 6
Charge capacity and recharge time 3 - 8
Battery string voltage drop and balancing 3 - 9
Battery size versus voltage drop 3 - 10
Calculating voltage drop 3 - 12
Conductor ampacity 3 - 12
Overcurrent protection 3 - 13
General guidelines 3 - 13
Fuses 3 - 13
Circuit breakers 3 - 14
Lineage® 2000 engineering specifics 3 - 14
Rectifier sizing 3 - 14
Battery sizing 3 - 15
Initial and supplementary bays 3 - 16
Cable and load breaker sizing 3 - 17
Record wire and breaker/fuse sizes 3 - 24
Low-voltage battery disconnect/reconnect feature 3 - 26
Low-voltage load disconnect/reconnect feature 3 - 26
Thermal (slope/step) compensation feature 3 - 26
Controller options 3 - 26
Alarm system interface 3 - 26
Earthquake bracing 3 - 27
Planning 3 - 27
Floor plan data 3 - 27
Grounding 3 - 28
Growth 3 - 28
Ordering reference material 3 - 29
Coding and terminology 3 - 29
J-drawings 3 - 30
T-drawings 3 - 34
SD-drawings 3 - 35
Ordering information 3 - 36
Ordering guide (list numbers) 3 - 37
Supplementary components (field installed) 3 - 38
Documentation references 3 - 40
4 Installation
General 4 - 1
Installation tools and test equipment 4 - 2
Suggested installation sequence 4 - 2
Sequence of tasks 4 - 4
Step A: Unpacking, handling & frame installation 4 - 4
Step B: Battery stand assembly 4 - 5
Step C: Cable support and ground system 4 - 5
Step D: Controller and LVD set-up 4 - 5