Lucent Technologies Lineage
®
2000 ECS Battery Plant J85500D-3
Issue 5 January 1999 Table of Contents - 3
Step E: AC wiring, rectifier installation and test 4 - 6
Step F: Battery connections 4 - 6
Step G: Load wiring 4 - 7
Step H: Initial charge 4 - 12
Step I: Controller test 4 - 12
Step J: Load turn-up 4 - 12
Installation procedures for plant growth 4 - 13
Adding a load circuit 4 - 13
Installing thermal compensation unit in existing plant 4 - 15
Tools required 4 - 15
Test procedure 4 - 18
5 Maintenance
Controls and Indicators 5 - 1
DC Circuit Breakers 5 - 1
Troubleshooting 5 - 3
Open Distribution Breaker 5 - 3
Red LVD OPEN LED Lit 5 - 4
Yellow LVD FAIL LED Lit 5 - 4
Blown Fuse on LVD/Fuse Board 5 - 4
Repair and Replacement 5 - 4
Load Circuit Breaker Replacement 5 - 5
LVD/R Contactor Replacement 5 - 6
LVD/Fuse Board (CP5) Replacement 5 - 7
Spare Parts 5 - 7
6 Product Warranty
7Safety
Safety Statements 7 - 1
Warning Statements And Safety Symbols 7 - 3